skip to content
Menu
Commercial Recessed
Recessed LED lighting ideal for commercial applications
LAOFF
Surface and Suspended
Wide range of LED Surface & Suspended lighting
LA HEROOFF
Bulkheads
Wide range suitable for all applications
LAOFF
Downlights
LED Downlights perfect for domestic residential & commercial applications
A1OFF
Tracks and Spots
Accent lighting range ideal for retail applications
LA OFF
Emergency
Life-saving emergency escape lighting for all applications
LA OFF
Industrial
Robust & durable LED lighting range for the toughest applications
LA HEROOFF
Exterior Commercial
Premium LED lighting suitable for wall and column mounting
LA OFF
Domestic Lighting
Wide range of external residential lighting
LA OFF
Solar
Providing eco-friendly, energy-efficient lighting with solar-powered technology, perfect for outdoor spaces.
LA OFF
Inspection and Worklights
LA OFF
110V Site Worklights
Robust 110V site lighting solutions, designed for demanding environments.
LSLOAW361V 01 LSL Part LU LSLOAW361 01 0200 A1 HERO LIT
Platform Wireless Lighting Controls
A1 BASE
Platform Emergency Wireless Lighting Controls
Wired Lighting Controls
A1 BASE
Close
Menu Close
Menu

Case Study: Kings’ School Winchester

Winchester

LUCECO DELIVERS COMPREHENSIVE LIGHTING SOLUTION FOR KINGS’ SCHOOL WINCHESTER 

Client Name: Kings’ School Winchester

Project Location: Winchester

Project Manager: Paul Carter

Date: April 2026 

 

Luceco has delivered a tailored lighting design for Kings’ School Winchester, creating a bright, efficient and visually comfortable learning environment across the school’s facilities. 

Supporting education with smart lighting design 

Kings’ School Winchester, a state-maintained secondary school, sought a lighting upgrade that would improve energy efficiency, visual comfort and long-term maintainability across classrooms, communal areas, and circulation spaces. 

Building on Luceco’s experience working with Hampshire County Council on previous educational and healthcare projects, the team developed a full lighting design, working closely with the installing contractor to ensure the solution met both functional and aesthetic requirements. 

Delivering impact within constraints 

The lighting scheme incorporated a carefully selected range of Luceco products to ensure uniform illumination, compliance with educational standards and ease of maintenance: 

LuxPanel Connect  High-performance LED panels offering low glare and consistent, uniform lighting ideal for classroom and study environments.
Platinum with Platform  Flexible downlighting solution providing high-quality illumination with advanced control options for energy efficiency.
Academy Range  Robust linear lighting designed to suit corridors, communal areas and learning spaces. 
DWW Windsor Bespoke Columns  Exterior lighting solutions that complement the school’s architecture while ensuring durability and safety.
Exit Signage Compliant emergency signage integrated seamlessly throughout the building.

This combination of internal and external luminaires delivered a cohesive, future-ready lighting solution tailored to the school environment. 

Trusted for educational projects 

Luceco’s continued work with Hampshire County Council reflects its commitment to supporting public sector education facilities. Familiarity with the council’s standards allowed for a smooth design process, ensuring the project was delivered efficiently while meeting all technical requirements. 

Paul Carter, Account Manager at Luceco said, ‘Having worked with Hampshire County Council on other school projects, we understand the importance of reliable, compliant, and visually comfortable lighting for both students and staff. At Kings’ School Winchester, we were able to deliver a solution that enhances learning environments while providing long-term energy and maintenance benefits.’ 

Through projects like this, Luceco continues to Grow, Innovate and Sustain, providing dependable, high-quality lighting solutions that support educational excellence and improve day-to-day experiences for students and staff alike. 

Client: Kings’ School Winchester

Location: Winchester

Luceco Project Manager: Paul Carter

Date: April 2026